Demolition continued this week--it's a big house and there is a lot to be done. The focus this week, in addition to continuing effort on taking out existing tile floors and interior finishes, was some exterior walls and vegetation in the front. Entering the house from the back patio, things don't look all too different until you fully turn the corner.
The living room and kitchen were largely torn out after the first week's work, but the big change there this week is the removal of the exterior siding (other other materials on the exterior wall). Here are some pictures from both the interior and exterior points of view, including the look into the dining room that I pointed out in the last post.
Another area that saw the beginning of demolition this week was the great room. The pocket doors by the dining room were removed, and in the great room--the floors, windows, and wall facings.
The last area seeing major change this week was Timothy's bedroom and bathroom. Walls came down, cabinets and windows were removed
| View from Tim's room into what used to be his bathroom (toilet was on the right, shower in the middle, sink/vanity on the left.) |
| Same view as above. |
![]() |
| I tried to capture the opening to Tim's bathroom here, to re-imagine the new layout. |
Seeing some minor[ish] changes were the master bathroom (where the tub/shower tile were all removed) and the laundry room (where the cabinets etc. were removed).
| Master bath: tub was in the middle, with shower on left, toilet on right. |
![]() |
| Laundry room...where the cabinets used to be. |