Well, we passed the one-year mark. Sigh. It really was just about the longest year ever. The closer we got to that mark, the more we started becoming aware of multiple [major] issues concerning our contractor. The more we worked at getting them resolved, the more it became apparent that there was going to be no way to rebuild the level of trust needed to continue the relationship. After weeks of delaying the project (the last thing we want) in order to make sure we had thought through the quandary and didn't act rashly, we made the difficult decision to let our contractor go, and finish the house ourselves. We did retain Jerry, (the supervisor,) and were able to straighten things out with most of the sub-contractors so that they could continue on the job. It was an ordeal, but it was also—ultimately—a relief.
Now we have no delays except those of our own making, so the pace of the job has been kicked into high gear. Framing, plumbing, and HVAC have continued, with work on the roof starting as well. Though we have made most of our decisions, there is still problem solving to be done and some details to nail down.
This is the new wall between Andrew's and Audrey's closets. Remember me saying that we took out the closets to make room for a superior HVAC installation? Come to find out, there was no wall between those closets, only the backs of the closets themselves separated the two rooms. No wonder they could hear each other so well! So a wall was built, and the HVAC now runs from under the house, and through slim ducts inside that wall. They will vent over the tops of the closets, hidden behind the belly band that runs around the tops of the rooms. This same system solution is being used in the master bathroom, living room, and Tim's room.

In other areas of the house, we needed an even more specialized system. The kitchen and dining room are two of the rooms that do not have an open-beam ceiling, but that doesn't mean the ceiling doesn't have detail of its own. There is a soffit (of sorts) around the perimeter of the ceiling, with a large light box in the center that has the roof beam running through it. In an effort to avoid conspicuous vents dotting the soffit, our HVAC team custom-made special linear vents that were able to fit in the space between the two parallel ceiling beams. They look really nice, though it is hard to see in the picture! We repeated this linear system in the library as well as the hallway by Timothy's room.

A handful of other items have progressed as well. Melinda's room has a doorway. The massive trench that had to be dug in the back yard to accommodate a new sewer line and gas line has been dug and refilled. The existing built-in barbecue has been pulled out to make way for a pizza oven and new grill. The roof has been started. And the grading in the front yard has begun.
 |
Melinda has a doorway! She also has a catwalk - one
of Chris's self-proclaimed "hair-brained ideas" that
looks to become a reality! |
 |
| The trench in the patio area has been refilled. |
 |
The trench continued along the planter outside the
bedrooms. |
 |
| There once was a barbecue...and there shall be again. Just not brick this time. |
 |
Oooh! Plumbing! There's my washer and dryer hook-ups in my newly
situated laundry room! Progress! |
 |
Plumbing and framing have begun in the kitchen as well.
Our kitchen layout has changed completely.
Pictured above is the new island. |
 |
In the guest bedroom, the area above the belly band line used to be filled
with glass (most likely because that wall used to be an exterior wall) but will
now be drywall all the way up. This is partly to provide a solution for hiding
the soffit in the hallway (which you could see through the glass) and partly
for a better sound barrier between the two rooms. |
 |
Seen from the other side, in Timothy's room. This was the
best solution for this space (good problem solving and
decision making, Chris!) |
 |
In the front yard, more demo is being done—specifically
to the retaining wall—in order to prepare the grading
and drainage for the new landscape plan. |
 |
Although the retaining wall has been taken out, it will be
replaced. It needed to be deeper due to the basement
addition, so replacement was necessary. |
 |
In a very very dry winter season, when is the one time it will rain like the Dickens?
When you replace the roof, of course. Everything was covered in time to
prevent any damage, so no harm done. |