The Thanksgiving holiday and many drizzly days slowed down progress on the work, but that's okay because the many Christmas parties and preparations have slowed down my progress on the blog! Recent developments include more demolition as well as the installation of numerous steel beams that will be supporting the house while the basement is being dug.
| A kind of funny view from the street by the garage shows that while much demo has been done already, there is still more to do. |
| Here you can see the same wall as in the previous picture, this time the photo is shot from inside the house (from Tim's room). |
| And now the opposite view...looking back at Tim's room from the great room. |
| Over on the other side of the house, the walls around the master suite are being worked on as well. |
| Up on the upper deck by the great room, some exploration has been done in hopes that we'll be able to figure out a way to raise that corner of the house, as it has suffered from settling of some sort. |
| In this view of the living room and bedroom wing, you can see into (and through) the bedrooms, and you can also get a hint of how the steel beams are installed around the front of the house. |
| The other end of those beams stretch out the front of the house. |
| Inside, walking around isn't much of an option at this point. This picture is taken from the kitchen, looking towards the living room. |
![]() |
| This is actually looking at basically the same area as the previous picture was, just a bit narrower in scope. |
| Front porch & bridge area |
| Looking from the front door towards the back door. |
As you can see, progress is being made. All the changes feel like big changes, although the end isn't anywhere in sight at this point. When shoring is complete, the foundation work can begin. As far as design goes, we are firming up plans for the basement area so that electrical and plumbing placement will be ready to go once the foundation is complete.