In addition to the framing and HVAC, some of the interior rough-in plumbing is happening. Also, we are in the process of trying to make final decisions regarding the exterior surfaces of the house. This includes the style of the siding, the finish of the block, and how the windows are installed in all situations. Because the house is so big (so long, really) it is a challenge to make each part interesting without making it look disjointed.Meanwhile, on the interior design front, much progress has been made with selecting tile for the bathrooms as well as the faucets and other fixtures. We have decided to use wall mounted toilets from Toto (except in the basement where it won't be possible) and most faucets and shower fixtures are from La Cava.
It is difficult to determine which design decisions need to be made next, so we just keep plugging away at getting everything tied together and perfect. It is nice to see the house begin to come back together. I'm ready to move back in already!
| The drop ceiling in the basement has been adjusted to properly tie into the belly band design in the lower entry. We are very happy that this was a solvable problem! |
| Both windows in the theater have been eliminated. Chris is so happy! |
| Yes, please. |
![]() |
| The full HVAC trench in the lower entry way. |
| The future kitchen. It looks so much closer to the living room now that there isn't a seven foot wall in between. The glass railing that will take its place will keep the areas much more open. |
| The sliding glass doors in the great room are some that will be receiving special treatment - a system by Vitrocsa that will open all the way up. |
![]() |
| Starting to look like a house again! |
| Little by little... |
| A lot of grading and drainage still needs to happen in the front, but it is shaping up. |
| The trash can area will eventually have a gate to disguise the bins. We are happy to have eliminate the window to the master bathroom that used to be here. Who wants a window to the trash?? |
| Saving my rocks! Yay rocks! |
Developments in the bedrooms: The hallway outside of Tim's room needed to have the soffit rebuilt (the one we originally installed when creating the hallway in order to have access to the guest room). For some reason, rebuilding it properly has been much more difficult than the original building was. I still can't quite figure that one out, but as long as we end up with a good product, everything is cool. The first picture below shows the beginnings of it...prepare to be confused!
![]() |
| Soffit in the hallway outside Tim's room. |
| Melinda's room has such a nice, open, loft feel. It's been a fun room to design! |
![]() |
| The other corner of Melinda's room: she has a large, blank wall that we are planning on treating with a special treatment for our in-house artist. |