One area of confusion that needed some clarification was on the back patio where the new footings and posts were being installed. Because of the direction of the beams in the balcony, the recessed outdoor heaters will have to change direction. Also, some of the posts (not pictured below) detailed by the engineer posed a design problem as they didn't align with other lines with the house and exterior lattice work, but were able to be moved. In addition, we have decided to use wood as the finish material on the 'ceiling' instead of replacing the stucco, adding more warmth and that modern touch.
![]() |
| Footings have been poured and new, larger posts have been put in place. These posts will eventually be wrapped to make them prettier. |
![]() |
| This stretch will eventually have lattice work in the same style and size as was existing. The post in the foreground was one that needed to line up with the planter box on the other side of the porch. |
| The bar, wine cellar, and mechanical room all sit to the right of the stairway. |
| The theater, powder room, and electronics room lie to the left of the stairway. |
More progress: the stairs between the kitchen and laundry room that connect the kitchen to the living room have been built. If you have been to the house before construction, you will notice that the new stairs are built with an angle on one side so they are wider on the bottom. This was Chris's idea as a way to fix the tunnel-like claustrophobia the previous stairs caused, and we love how open it feels!
![]() |
| No more tripping up the first step, either, as they will all be the same height once flooring is installed. |